EARLY ALPHA 0.8.13 ·
IRONWORKS FINAL POLISH
BUG FIXES & POLISH
- Added heavy steel gate material to the Main Exit rear wall and side-opening frame, the Forklift Area hallway, and both sides of the Container Exit opening.
- Added a dedicated worn plaster-and-frame wall material throughout the Offices.
- Preserved every existing doorway and collision opening; the new treatments are textures only and add no door leaves.
